[
https://issues.apache.org/jira/browse/HBASE-16625?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Heng Chen updated HBASE-16625:
------------------------------
Attachment: pe_wo_patch_incremnt.log
pe_wo_patch_append.log
pe_w_patch_increment.log
pe_w_patch_append.log
upload the original test log, each log has 10 runs of pe
> Performance test for interface unified with AP
> ----------------------------------------------
>
> Key: HBASE-16625
> URL: https://issues.apache.org/jira/browse/HBASE-16625
> Project: HBase
> Issue Type: Sub-task
> Reporter: Heng Chen
> Assignee: Heng Chen
> Attachments: pe_w_patch_append.log, pe_w_patch_increment.log,
> pe_wo_patch_append.log, pe_wo_patch_incremnt.log
>
>
> Due to one more thread context changed in AP, the performance should be
> tested. Let me do it in this issue.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)