[ 
https://issues.apache.org/jira/browse/HBASE-16562?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15602093#comment-15602093
 ] 

Sean Busbey commented on HBASE-16562:
-------------------------------------

I don't see a rel/0.98.23 tag, but I believe this change was included in the 
0.98.23RC0 that passed a vote. Do you still want a simple revert there? Or 
would you prefer I leave the 0.98 fix version here and make a follow-on that 
backs out the changes for the next 0.98 release?

> ITBLL should fail to start if misconfigured
> -------------------------------------------
>
>                 Key: HBASE-16562
>                 URL: https://issues.apache.org/jira/browse/HBASE-16562
>             Project: HBase
>          Issue Type: Improvement
>          Components: integration tests
>            Reporter: Andrew Purtell
>            Assignee: Heng Chen
>             Fix For: 2.0.0, 1.0.4, 1.4.0, 1.3.1, 1.1.7, 0.98.23, 1.2.5
>
>         Attachments: HBASE-16562-branch-1.2.patch, 
> HBASE-16562-branch-1.2.v1.patch, HBASE-16562.patch, HBASE-16562.v1.patch, 
> HBASE-16562.v1.patch-addendum
>
>
> The number of nodes in ITBLL must a multiple of width*wrap (defaults to 25M, 
> but can be configured by adding two more args to the test invocation) or else 
> verification will fail. This can be very expensive in terms of time or hourly 
> billing for on demand test resources. Check the sanity of test parameters 
> before launching any MR jobs and fail fast if invariants aren't met with an 
> indication what parameter(s) need fixing. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to