[ 
https://issues.apache.org/jira/browse/HBASE-17602?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16020305#comment-16020305
 ] 

Hudson commented on HBASE-17602:
--------------------------------

FAILURE: Integrated in Jenkins build HBase-Trunk_matrix #3059 (See 
[https://builds.apache.org/job/HBase-Trunk_matrix/3059/])
HBASE-17602 Reduce some quota chore periods/delays (elserj: rev 
8159eae7810a6bf6e13596fed9f8cb7f1aff9dfc)
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/quotas/QuotaObserverChore.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/quotas/SpaceQuotaRefresherChore.java


> Tweak chore delay/period defaults
> ---------------------------------
>
>                 Key: HBASE-17602
>                 URL: https://issues.apache.org/jira/browse/HBASE-17602
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Josh Elser
>            Assignee: Josh Elser
>            Priority: Trivial
>             Fix For: HBASE-16961
>
>         Attachments: HBASE-17602.001.HBASE-16961.patch
>
>
> In testing, found that the default chore periods/delays were a little too 
> lax. This resulted in quotas not being updated as soon as they really should 
> have been.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to