[ 
https://issues.apache.org/jira/browse/HBASE-13319?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-13319:
--------------------------
    Fix Version/s:     (was: 2.0.0)
           Status: In Progress  (was: Patch Available)

Unscheduling.

> Support 64-bits total row number in PerformanceEvaluation
> ---------------------------------------------------------
>
>                 Key: HBASE-13319
>                 URL: https://issues.apache.org/jira/browse/HBASE-13319
>             Project: HBase
>          Issue Type: Improvement
>          Components: Performance
>            Reporter: Liu Shaohui
>            Assignee: Liu Shaohui
>            Priority: Minor
>         Attachments: HBASE-13319-trunk-v1.diff
>
>
> Currently the total row number in PerformanceEvaluation is 32 bits. It's not 
> enough when testing a large hbase cluster using PerformanceEvaluation in 
> mapreduce mode.
> Suggestions are welcomed~ Thanks



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to