[
https://issues.apache.org/jira/browse/HBASE-13319?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stack updated HBASE-13319:
--------------------------
Fix Version/s: (was: 2.0.0)
Status: In Progress (was: Patch Available)
Unscheduling.
> Support 64-bits total row number in PerformanceEvaluation
> ---------------------------------------------------------
>
> Key: HBASE-13319
> URL: https://issues.apache.org/jira/browse/HBASE-13319
> Project: HBase
> Issue Type: Improvement
> Components: Performance
> Reporter: Liu Shaohui
> Assignee: Liu Shaohui
> Priority: Minor
> Attachments: HBASE-13319-trunk-v1.diff
>
>
> Currently the total row number in PerformanceEvaluation is 32 bits. It's not
> enough when testing a large hbase cluster using PerformanceEvaluation in
> mapreduce mode.
> Suggestions are welcomed~ Thanks
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)