[ https://issues.apache.org/jira/browse/HBASE-18508?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16137130#comment-16137130 ]
Amit Patel commented on HBASE-18508: ------------------------------------ Also retry with [^HBASE-18508.HBASE-14070.HLC.006.patch] (which is the exact same as [^HBASE-18508.HBASE-14070.HLC.002.patch]) to verify that TestCellACLWithMultipleVersions passes. > [HLC] Fix timing out tests in HBASE-14070.HLC branch > ---------------------------------------------------- > > Key: HBASE-18508 > URL: https://issues.apache.org/jira/browse/HBASE-18508 > Project: HBase > Issue Type: Sub-task > Reporter: Appy > Assignee: Amit Patel > Attachments: > 0001-HBASE-18508-empty-patch-added-new-line-in-TestClockW.patch, > HBASE-18508.HBASE-14070.HLC.001.patch, HBASE-18508.HBASE-14070.HLC.002.patch, > HBASE-18508.HBASE-14070.HLC.003.patch, HBASE-18508.HBASE-14070.HLC.003.patch, > HBASE-18508.HBASE-14070.HLC.004.patch, HBASE-18508.HBASE-14070.HLC.005.patch, > HBASE-18508.HBASE-14070.HLC.006.patch > > > Pre-commit runs for this branch output a huge list of timed out tests. Not > seeing those in master branch. > Needs to be fixed before merging. -- This message was sent by Atlassian JIRA (v6.4.14#64029)