[ 
https://issues.apache.org/jira/browse/HBASE-18508?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16137130#comment-16137130
 ] 

Amit Patel commented on HBASE-18508:
------------------------------------

Also retry with [^HBASE-18508.HBASE-14070.HLC.006.patch] (which is the exact 
same as [^HBASE-18508.HBASE-14070.HLC.002.patch]) to verify that 
TestCellACLWithMultipleVersions passes.

> [HLC] Fix timing out tests in HBASE-14070.HLC branch
> ----------------------------------------------------
>
>                 Key: HBASE-18508
>                 URL: https://issues.apache.org/jira/browse/HBASE-18508
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Appy
>            Assignee: Amit Patel
>         Attachments: 
> 0001-HBASE-18508-empty-patch-added-new-line-in-TestClockW.patch, 
> HBASE-18508.HBASE-14070.HLC.001.patch, HBASE-18508.HBASE-14070.HLC.002.patch, 
> HBASE-18508.HBASE-14070.HLC.003.patch, HBASE-18508.HBASE-14070.HLC.003.patch, 
> HBASE-18508.HBASE-14070.HLC.004.patch, HBASE-18508.HBASE-14070.HLC.005.patch, 
> HBASE-18508.HBASE-14070.HLC.006.patch
>
>
> Pre-commit runs for this branch output a huge list of timed out tests. Not 
> seeing those in master branch.
> Needs to be fixed before merging.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to