[ 
https://issues.apache.org/jira/browse/HBASE-18907?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ted Yu updated HBASE-18907:
---------------------------
       Resolution: Fixed
     Hadoop Flags: Reviewed
    Fix Version/s: 1.2.7
           Status: Resolved  (was: Patch Available)

Thanks for the patch, Guangxu.

> Methods missing rpc timeout parameter in HTable
> -----------------------------------------------
>
>                 Key: HBASE-18907
>                 URL: https://issues.apache.org/jira/browse/HBASE-18907
>             Project: HBase
>          Issue Type: Bug
>    Affects Versions: 1.2.6
>            Reporter: Ted Yu
>            Assignee: Guangxu Cheng
>              Labels: client
>             Fix For: 1.2.7
>
>         Attachments: HBASE-18907.branch-1.2.patch
>
>
> When revisiting HBASE-15645, I found that two methods (mutateRow and 
> checkAndMutate) miss the rpcTimeout parameter to newCaller() in HTable:
> {code}
>     return rpcCallerFactory.<Boolean> newCaller().callWithRetries(callable, 
> this.operationTimeout);
> {code}
> I checked branch-1.2
> Other branch(es) may have the same problem



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to