[ 
https://issues.apache.org/jira/browse/HBASE-19226?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16248785#comment-16248785
 ] 

Reid Chan commented on HBASE-19226:
-----------------------------------

Got it, thanks for your explanation [~Yun Zhao]
What about supports not only ratio but also a specified number(int) > 1, like 5 
reducers wanted, i'd prefer a 5 rather than 0.005 if hbase has 1000 regions or 
more which always happens in production.

> Limit the reduce tasks number of incremental load
> -------------------------------------------------
>
>                 Key: HBASE-19226
>                 URL: https://issues.apache.org/jira/browse/HBASE-19226
>             Project: HBase
>          Issue Type: Improvement
>            Reporter: Yun Zhao
>            Assignee: Yun Zhao
>            Priority: Minor
>         Attachments: HBASE-19226.master.001.patch, 
> HBASE-19226.master.002.patch
>
>
> When using MapReduce job to perform an incremental load into a table,the 
> number of reduce tasks is the current number of regions. If there are too 
> many regions, will lead to network+disk I/O is too large, affecting the 
> real-time request.
> Need to use a configuration to set a number or ratio?
> Limit running reduce tasks since 
> [https://issues.apache.org/jira/browse/MAPREDUCE-5583], the old version can 
> only be set reduce number.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to