[ 
https://issues.apache.org/jira/browse/HBASE-19891?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16344822#comment-16344822
 ] 

Hudson commented on HBASE-19891:
--------------------------------

FAILURE: Integrated in Jenkins build HBase-Trunk_matrix #4495 (See 
[https://builds.apache.org/job/HBase-Trunk_matrix/4495/])
HBASE-19891 Up nightly test run timeout from 6 hours to 8 (stack: rev 
9b8d7e0aefe29fea474e06ab21f9288245ac3bf5)
* (edit) dev-support/Jenkinsfile


> Up nightly test run timeout from 6 hours to 8
> ---------------------------------------------
>
>                 Key: HBASE-19891
>                 URL: https://issues.apache.org/jira/browse/HBASE-19891
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: stack
>            Assignee: stack
>            Priority: Major
>             Fix For: 2.0.0-beta-2
>
>         Attachments: HBASE-19891.master.001.patch
>
>
> Yesterday, a nightly run for hbase2 passed all unit tests against hadoop2. 
> Hadoop3 tests got cut off at the 6 hour mark, our maximum total run time. 
> This is crazy but for now, just up the max time from 6 to 8 hours to see if 
> we can get a good build in. Can work on breaking this down in subsequent 
> issues. To be clear, the nightly 2.0 runs full test suite against hadoop2 and 
> then hadoop3... this is why it takes a while.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to