[
https://issues.apache.org/jira/browse/HBASE-19911?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16348180#comment-16348180
]
Chia-Ping Tsai commented on HBASE-19911:
----------------------------------------
TestClientClusterMetrics and TestFavoredNodeAssignmentHelper timeout also.
TestClientClusterMetrics is the new version of TestClientClusterStatus so it
should be promoted to be medium test too. My local machine takes 20 seconds to
run TestFavoredNodeAssignmentHelper. It won't harm if we promote it to be
medium test also I think.
see
https://builds.apache.org/job/PreCommit-HBASE-Build/11316/artifact/patchprocess/patch-unit-hbase-server.txt
> Convert some tests from small to medium because they are timing out:
> TestNettyRpcServer, TestClientClusterStatus, TestCheckTestClasses
> --------------------------------------------------------------------------------------------------------------------------------------
>
> Key: HBASE-19911
> URL: https://issues.apache.org/jira/browse/HBASE-19911
> Project: HBase
> Issue Type: Sub-task
> Reporter: stack
> Assignee: stack
> Priority: Major
> Fix For: 2.0.0-beta-2
>
> Attachments: HBASE-19911.branch-2.001.patch
>
>
> Found some more timeouts of small tests.
> TestNettyRpcServer
> https://builds.apache.org/view/H-L/view/HBase/job/PreCommit-HBASE-Build/11307/testReport/junit/org.apache.hadoop.hbase.ipc/TestNettyRpcServer/org_apache_hadoop_hbase_ipc_TestNettyRpcServer/
> On local machine takes 14 seconds to run 1 test. In the above failure..., the
> test needs another second or so to complete.... It has been running 30
> seconds.
> Starts a minihbasecluster, creates a table, then shuts down. Shouldn't even
> take 3 seconds but thats another story.
> TestClientClusterStatus is a small test that starts 5 regionservers and 3
> masters. Then does some stopping of servers, etc.
> .. in same test run...
> https://builds.apache.org/view/H-L/view/HBase/job/PreCommit-HBASE-Build/11307/testReport/junit/org.apache.hadoop.hbase/TestClientClusterStatus/org_apache_hadoop_hbase_TestClientClusterStatus/
> ... it timed out after 30 seconds. Its almost done w/ shutdown but not quite.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)