[ 
https://issues.apache.org/jira/browse/HBASE-18228?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-18228:
--------------------------
    Fix Version/s:     (was: 3.0.0)
                       (was: 2.0.0)

> HBCK improvements
> -----------------
>
>                 Key: HBASE-18228
>                 URL: https://issues.apache.org/jira/browse/HBASE-18228
>             Project: HBase
>          Issue Type: Improvement
>          Components: hbck
>            Reporter: Lars Hofhansl
>            Assignee: Karan Mehta
>            Priority: Critical
>             Fix For: 1.5.0, 1.4.3
>
>         Attachments: HBASE-18228.branch-1.3.patch
>
>
> We just had a prod issue and running HBCK the way we did actually causes more 
> problems.
> In part HBCK did stuff we did not expect, in part we had little visibility 
> into what HBCK was doing, and in part the logging was confusing.
> I'm proposing 2 improvements:
> 1. A dry-run mode. Run, and just list what would have been done.
> 2. An interactive mode. Run, and for each action request Y/N user input. So 
> that a user can opt-out of stuff.
> [~jmhsieh], FYI



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to