[ 
https://issues.apache.org/jira/browse/HBASE-20138?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Zheng Hu updated HBASE-20138:
-----------------------------
    Attachment: HBASE-20138.v3.patch

> Find a way to deal with the conflicts when updating replication position
> ------------------------------------------------------------------------
>
>                 Key: HBASE-20138
>                 URL: https://issues.apache.org/jira/browse/HBASE-20138
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Duo Zhang
>            Assignee: Zheng Hu
>            Priority: Major
>             Fix For: 3.0.0, 2.1.0
>
>         Attachments: HBASE-20138.v1.patch, HBASE-20138.v2.patch, 
> HBASE-20138.v3.patch
>
>
> For now if a table is not created with SERIAL_REPLICATION_SCOPE and later 
> converted to SERIAL_REPLICATION_SCOPE , then we may have multiple replication 
> sources which replicate the different ranges for the same region and update 
> the queue storage concurrently. This will cause problem if the lower range 
> finish at last since the replication position will be wrong...
> Need to find a way to deal with this.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to