[ 
https://issues.apache.org/jira/browse/HBASE-18828?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16428573#comment-16428573
 ] 

stack commented on HBASE-18828:
-------------------------------

Thanks for the help. I made the graph last night, was impressed by the 
spaghetti then went to bed saving pleasure of deciphering for this morning. You 
view saved me some head-scratching. Thanks.

bq. would be better to use master instead of branch-2 I think....

What command you running?

Currently I'm thinking I need to figure what is in hbase1 that is also in 
hbase2 and remove 2.0.0 from JIRA for those commits. You suggesting otherwise?

> [2.0] Generate CHANGES.txt
> --------------------------
>
>                 Key: HBASE-18828
>                 URL: https://issues.apache.org/jira/browse/HBASE-18828
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: stack
>            Assignee: stack
>            Priority: Blocker
>             Fix For: 2.0.0
>
>         Attachments: changelog.md, hbase_branches.svg, releasenotes.md
>
>
> See [~busbey] writeup on generating CHANGES.txt here HBASE-14025 (fold it 
> into refguide while at it..)



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to