[ 
https://issues.apache.org/jira/browse/HBASE-20682?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-20682:
--------------------------
    Fix Version/s:     (was: 2.0.1)
                   2.0.2

> MoveProcedure can be subtask of 
> ModifyTableProcedure/ReopenTableRegionsProcedure; ensure all kosher.
> ----------------------------------------------------------------------------------------------------
>
>                 Key: HBASE-20682
>                 URL: https://issues.apache.org/jira/browse/HBASE-20682
>             Project: HBase
>          Issue Type: Sub-task
>          Components: amv2
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>             Fix For: 2.0.2
>
>
> MoveProcedure is used in at least two places as a means of 'reopening' a 
> region after a config has changed. This issue is about review of MP so this 
> usage is first-class (and that MP is good procedure citizen running as a 
> subprocedure. In question is what should happen if the source server or the 
> target servers are offline when we go to run. As of the parent issue, we'll 
> skip to the end. Should we instead go ahead with the move (internally, if we 
> are asked to assign to an offline server, we'll pick another -- do same for 
> unassign? Would help in this reopen use case).



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to