chenxu created HBASE-20902:
------------------------------

             Summary: when WAL sync failed, we should bypass the failed DN that 
previously used
                 Key: HBASE-20902
                 URL: https://issues.apache.org/jira/browse/HBASE-20902
             Project: HBase
          Issue Type: Bug
          Components: wal
            Reporter: chenxu


in our prod env, there happened to be a slow DN, all WAL#sync with that DN are 
failed, 

during Log rolling, we should bypass the slow DN that previously Log used.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to