[
https://issues.apache.org/jira/browse/HBASE-20881?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16569430#comment-16569430
]
Duo Zhang commented on HBASE-20881:
-----------------------------------
A big patch...
Haven't finished yet, especially the UTs. And I've added some TODOs in the
code, we can open follow-on issue to address them, as the patch here is already
big enough...
> Introduce a region transition procedure to handle all the state transition
> for a region
> ---------------------------------------------------------------------------------------
>
> Key: HBASE-20881
> URL: https://issues.apache.org/jira/browse/HBASE-20881
> Project: HBase
> Issue Type: Sub-task
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Fix For: 3.0.0, 2.2.0
>
> Attachments: HBASE-20881.patch
>
>
> Now have an AssignProcedure, an UnssignProcedure, and also a
> MoveRegionProcedure which schedules an AssignProcedure and an
> UnssignProcedure to move a region. This makes the logic a bit complicated, as
> MRP is not a RIT, so when SCP can not interrupt it directly...
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)