[
https://issues.apache.org/jira/browse/HBASE-20881?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Duo Zhang updated HBASE-20881:
------------------------------
Attachment: (was: HBASE-20881-v11.patch)
> Introduce a region transition procedure to handle all the state transition
> for a region
> ---------------------------------------------------------------------------------------
>
> Key: HBASE-20881
> URL: https://issues.apache.org/jira/browse/HBASE-20881
> Project: HBase
> Issue Type: Sub-task
> Components: amv2, proc-v2
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Fix For: 3.0.0, 2.2.0
>
> Attachments: HBASE-20881-v1.patch, HBASE-20881-v10.patch,
> HBASE-20881-v2.patch, HBASE-20881-v3.patch, HBASE-20881-v4.patch,
> HBASE-20881-v4.patch, HBASE-20881-v5.patch, HBASE-20881-v6.patch,
> HBASE-20881-v7.patch, HBASE-20881-v7.patch, HBASE-20881-v8.patch,
> HBASE-20881-v9.patch, HBASE-20881.patch
>
>
> Now have an AssignProcedure, an UnssignProcedure, and also a
> MoveRegionProcedure which schedules an AssignProcedure and an
> UnssignProcedure to move a region. This makes the logic a bit complicated, as
> MRP is not a RIT, so when SCP can not interrupt it directly...
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)