[
https://issues.apache.org/jira/browse/HBASE-21287?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Mike Drob updated HBASE-21287:
------------------------------
Resolution: Fixed
Fix Version/s: 2.0.3
2.1.1
2.2.0
3.0.0
Release Note: Local HBase cluster (as used by unit tests) wait times on
startup and initialization can be configured via
`hbase.master.start.timeout.localHBaseCluster` and
`hbase.master.init.timeout.localHBaseCluster`
Status: Resolved (was: Patch Available)
Pushed to branch-2.0+
> JVMClusterUtil Master initialization wait time not configurable
> ---------------------------------------------------------------
>
> Key: HBASE-21287
> URL: https://issues.apache.org/jira/browse/HBASE-21287
> Project: HBase
> Issue Type: Task
> Components: test
> Reporter: Mike Drob
> Assignee: Mike Drob
> Priority: Major
> Fix For: 3.0.0, 2.2.0, 2.1.1, 2.0.3
>
> Attachments: HBASE-21287.patch
>
>
> We can configure how long the local cluster threads will wait for master to
> come up and become active, but not how long we allow initialization to take.
> Being able to tune this would improve my test loop on some experiment I am
> running.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)