[ 
https://issues.apache.org/jira/browse/HBASE-21309?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang updated HBASE-21309:
------------------------------
         Assignee: Duo Zhang
    Fix Version/s: 2.0.3
                   2.1.1
                   2.2.0
                   3.0.0
           Status: Patch Available  (was: Open)

> Increase the waiting timeout for TestProcedurePriority
> ------------------------------------------------------
>
>                 Key: HBASE-21309
>                 URL: https://issues.apache.org/jira/browse/HBASE-21309
>             Project: HBase
>          Issue Type: Sub-task
>          Components: test
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>             Fix For: 3.0.0, 2.2.0, 2.1.1, 2.0.3
>
>         Attachments: HBASE-21309.patch
>
>
> On loaded jenkins nodes it will be easily timed out, so let's increase the 
> timeout value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to