[
https://issues.apache.org/jira/browse/HBASE-21265?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stack updated HBASE-21265:
--------------------------
Status: Patch Available (was: Reopened)
2.1.001 backport to branch-2.1
> Split up TestRSGroups
> ---------------------
>
> Key: HBASE-21265
> URL: https://issues.apache.org/jira/browse/HBASE-21265
> Project: HBase
> Issue Type: Task
> Components: rsgroup, test
> Affects Versions: 1.4.8
> Reporter: Andrew Purtell
> Assignee: Andrew Purtell
> Priority: Minor
> Labels: beginner, beginners
> Fix For: 3.0.0, 1.5.0, 2.2.0, 1.4.9
>
> Attachments: HBASE-21265-branch-1.patch, HBASE-21265-branch-1.patch,
> HBASE-21265-branch-2.patch, HBASE-21265-branch-2.patch,
> HBASE-21265.branch-2.1.001.patch, HBASE-21265.patch, HBASE-21265.patch
>
>
> TestRSGroups is flaky. It is stable when run in isolation but when run as
> part of the suite with concurrent executors it can fail. The current running
> time of this unit on my dev box is ~240 seconds (4 minutes), which is far too
> much time. This unit should be broken up 5 to 8 ways, grouped by
> functionality under test.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)