stack created HBASE-21666:
-----------------------------

             Summary: Break up the TestExportSnapshot UTs; they can timeout
                 Key: HBASE-21666
                 URL: https://issues.apache.org/jira/browse/HBASE-21666
             Project: HBase
          Issue Type: Bug
          Components: test
            Reporter: stack


These timed out for [~Apache9] when he ran with the -PrunAllTests. Suggests 
breaking them up into smaller tests so less likely they'll timeout.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to