[
https://issues.apache.org/jira/browse/HBASE-21806?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Sergey Shelukhin updated HBASE-21806:
-------------------------------------
Description:
In large heterogeneous clusters sometimes a slow datanode can cause WAL syncs
to be very slow. In this case, before the bad datanode recovers, or is
discovered and repaired, it would be helpful to roll WAL on a very slow sync to
get a new pipeline.
Otherwise the slow WAL will impact write latency for a long time (slow writes
result in less writes result in the WAL not being rolled for longer)
was:In large heterogeneous clusters sometimes a slow datanode can cause WAL
syncs to be very slow. In this case, before the bad datanode recovers, or is
discovered and repaired, it would be helpful to roll WAL on a very slow sync to
get a new pipeline.
> add an option to roll WAL on very slow syncs
> --------------------------------------------
>
> Key: HBASE-21806
> URL: https://issues.apache.org/jira/browse/HBASE-21806
> Project: HBase
> Issue Type: Bug
> Reporter: Sergey Shelukhin
> Assignee: Sergey Shelukhin
> Priority: Major
>
> In large heterogeneous clusters sometimes a slow datanode can cause WAL syncs
> to be very slow. In this case, before the bad datanode recovers, or is
> discovered and repaired, it would be helpful to roll WAL on a very slow sync
> to get a new pipeline.
> Otherwise the slow WAL will impact write latency for a long time (slow writes
> result in less writes result in the WAL not being rolled for longer)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)