[
https://issues.apache.org/jira/browse/HBASE-21795?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16760392#comment-16760392
]
Hudson commented on HBASE-21795:
--------------------------------
Results for branch branch-2.0
[build #1317 on
builds.a.o|https://builds.apache.org/job/HBase%20Nightly/job/branch-2.0/1317/]:
(x) *{color:red}-1 overall{color}*
----
details (if available):
(/) {color:green}+1 general checks{color}
-- For more information [see general
report|https://builds.apache.org/job/HBase%20Nightly/job/branch-2.0/1317//General_Nightly_Build_Report/]
(/) {color:green}+1 jdk8 hadoop2 checks{color}
-- For more information [see jdk8 (hadoop2)
report|https://builds.apache.org/job/HBase%20Nightly/job/branch-2.0/1317//JDK8_Nightly_Build_Report_(Hadoop2)/]
(x) {color:red}-1 jdk8 hadoop3 checks{color}
-- For more information [see jdk8 (hadoop3)
report|https://builds.apache.org/job/HBase%20Nightly/job/branch-2.0/1317//JDK8_Nightly_Build_Report_(Hadoop3)/]
(/) {color:green}+1 source release artifact{color}
-- See build output for details.
> Client application may get stuck (time bound) if a table modify op is called
> immediately after split op
> -------------------------------------------------------------------------------------------------------
>
> Key: HBASE-21795
> URL: https://issues.apache.org/jira/browse/HBASE-21795
> Project: HBase
> Issue Type: Bug
> Components: amv2
> Reporter: Nihal Jain
> Assignee: Nihal Jain
> Priority: Critical
> Fix For: 3.0.0, 2.2.0, 2.1.3, 2.0.5, 2.3.0
>
> Attachments: HBASE-21795.master.001.patch
>
>
> *Steps:*
> * Create a table
> * Split the table
> * Modify the table immediately after splitting
> *Expected*:
> The modify table procedure completes and control returns back to client
> *Actual:*
> The modify table procedure completes and control does not return back to
> client, until catalog janitor runs and deletes parent or future timeout occurs
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)