https://issues.apache.org/jira/browse/HBASE-21934?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16774298#comment-16774298
 ] 

stack commented on HBASE-21934:
-------------------------------

It looks like you've identified a 'hole' in our accounting. Good one 
[~tianjingyun]. Keeping account of ongoing dispatched calls makes sense. Pity 
have to change all the Procedures to do it though. Wonder if a cleaner way of 
keeping account (probably not.... but asking anyways). Thanks.

> SplitWALProcedure get stuck during ITBLL
> ----------------------------------------
>
>                 Key: HBASE-21934
>                 URL: https://issues.apache.org/jira/browse/HBASE-21934
>             Project: HBase
>          Issue Type: Sub-task
>    Affects Versions: 2.x
>            Reporter: Jingyun Tian
>            Assignee: Jingyun Tian
>            Priority: Major
>             Fix For: 3.
>
>         Attachments: HBASE-21934.master.001.patch
>
>
> I encounter the problem that when master assign a splitWALRemoteProcedure to 
> a region server. The log of this region server says it failed to recover the 
> lease of this file. Then this region server is killed by chaosMonkey. As the 
> result, this procedure is not timeout and hang there forever.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to