[ 
https://issues.apache.org/jira/browse/HBASE-22135?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16806065#comment-16806065
 ] 

Duo Zhang commented on HBASE-22135:
-----------------------------------

Actually the test in the patch can pass without the modifications...

But anyway, I tried the patch for HBASE-21718 and TestFromClientSide can pass 
now.

Ping [~zghaobac]. Thanks.

> AsyncAdmin will not refresh master address
> ------------------------------------------
>
>                 Key: HBASE-22135
>                 URL: https://issues.apache.org/jira/browse/HBASE-22135
>             Project: HBase
>          Issue Type: Sub-task
>          Components: Admin, asyncclient, Client
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>         Attachments: HBASE-22135.patch
>
>
> This is a big problem... If we stop the active master and promote the backup 
> master, all methods in AsyncAdmin, which need to connect the master will fail 
> as they try to connect to the old active master forever...



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to