[
https://issues.apache.org/jira/browse/HBASE-21375?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16824009#comment-16824009
]
Hudson commented on HBASE-21375:
--------------------------------
Results for branch master
[build #954 on
builds.a.o|https://builds.apache.org/job/HBase%20Nightly/job/master/954/]: (x)
*{color:red}-1 overall{color}*
----
details (if available):
(x) {color:red}-1 general checks{color}
-- For more information [see general
report|https://builds.apache.org/job/HBase%20Nightly/job/master/954//General_Nightly_Build_Report/]
(x) {color:red}-1 jdk8 hadoop2 checks{color}
-- For more information [see jdk8 (hadoop2)
report|https://builds.apache.org/job/HBase%20Nightly/job/master/954//JDK8_Nightly_Build_Report_(Hadoop2)/]
(x) {color:red}-1 jdk8 hadoop3 checks{color}
-- For more information [see jdk8 (hadoop3)
report|https://builds.apache.org/job/HBase%20Nightly/job/master/954//JDK8_Nightly_Build_Report_(Hadoop3)/]
(/) {color:green}+1 source release artifact{color}
-- See build output for details.
(/) {color:green}+1 client integration test{color}
> Revisit the lock and queue implementation in MasterProcedureScheduler
> ---------------------------------------------------------------------
>
> Key: HBASE-21375
> URL: https://issues.apache.org/jira/browse/HBASE-21375
> Project: HBase
> Issue Type: Sub-task
> Components: proc-v2
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Fix For: 3.0.0, 2.2.0, 2.0.3, 2.1.2
>
> Attachments: HBASE-21375-UT.patch, HBASE-21375-UT2.patch,
> HBASE-21375-v1.patch, HBASE-21375-v2.patch, HBASE-21375.patch
>
>
> The problem for the old implementation is that we will only check the first
> procedure in a queue to see if it could run, if it can not, we will remove
> the queue from run queue. So when adding procedure to the scheduler, we have
> to try hard to put the procedure which can be executed in front of the queue,
> if there are corner cases where we fail to do so, it will likely lead to a
> dead lock, that's why we have the tricky code when loading procedures and try
> to add them into the scheduler, and also lots of 'if' in the doAdd method of
> MasterProcedureScheduler. But this is still not enough to make things right,
> so finally [~allan163] and I decided to change the logic in doPoll method,
> where we use a loop to find whether there is a procedure can be executed, not
> only the first one.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)