stack created HBASE-22696:
-----------------------------
Summary: LockProcedure cleanups
Key: HBASE-22696
URL: https://issues.apache.org/jira/browse/HBASE-22696
Project: HBase
Issue Type: Sub-task
Environment: Our Duo made some comments in the parent issue: "The
unlock method should not be able to execute at the same time with the execute
method? Otherwise there may be logic error?"
Reporter: stack
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)
