[ 
https://issues.apache.org/jira/browse/HBASE-22147?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang updated HBASE-22147:
------------------------------
    Summary: Integrate the github pull request with pre commit job  (was: 
Integrate the github pull request with hadoop QA.)

> Integrate the github pull request with pre commit job
> -----------------------------------------------------
>
>                 Key: HBASE-22147
>                 URL: https://issues.apache.org/jira/browse/HBASE-22147
>             Project: HBase
>          Issue Type: Umbrella
>            Reporter: Zheng Hu
>            Assignee: Duo Zhang
>            Priority: Major
>




--
This message was sent by Atlassian Jira
(v8.3.2#803003)

Reply via email to