https://issues.apache.org/jira/browse/HBASE-24126?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Michael Stack resolved HBASE-24126.
-----------------------------------
Fix Version/s: 2.3.0
3.0.0
Hadoop Flags: Reviewed
Release Note: Start docker with upped ulimit for nproc passing '--ulimit
nproc=12500'. It was 10000, the default, but made it 12500. Then, set
PROC_LIMIT in hbase-personality so when yetus runs, it is w/ the new 12500
value. (was: Start docker with upped ulimit for nproc. It was 10000 but made
it 12500. Then, set proclimit when we run yetus to be the new 12500 value.)
Assignee: Michael Stack
Resolution: Fixed
Merged master PR to master branch and to 2.3. On branch-2, applied a fixup to
make branch-2 look like branch-2.3 and master (it had had a bunch of addendums
applied against this JIRA but final solution undid some of the extra insurance
the original put in place; i.e. passing --proclimit=12500 when invoking yetus).
> Up the container nproc uplimit from 10000 to 12500
> --------------------------------------------------
>
> Key: HBASE-24126
> URL: https://issues.apache.org/jira/browse/HBASE-24126
> Project: HBase
> Issue Type: Sub-task
> Components: build
> Reporter: Michael Stack
> Assignee: Michael Stack
> Priority: Major
> Fix For: 3.0.0, 2.3.0
>
> Attachments:
> 0001-HBASE-24126-Up-the-container-nproc-uplimit-from-1000.patch
>
>
> Let me up the container nproc count from 10000. If many tests running in
> parallel, container could breach the 10000 limit: i.e. if a bunch of
> heavy-duty long tests run at same time (0.5C on a 16CPU machine means 8
> possible concurrents) and we spin up 1-2000 threads in each test, then could
> hit the 10000 limit. Move up the limit some expecially after INFRA just upped
> our limit to 30000.
--