[ 
https://issues.apache.org/jira/browse/HBASE-25284?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17235684#comment-17235684
 ] 

Michael Stack commented on HBASE-25284:
---------------------------------------

I put up a PR which removes the doc currently checked in and replaces it w/ 
pointers to the editable document. Suggest we use this as a stop gap while the 
design doc is again in flux? Doing this we release the RM so he can proceed 
with the 2.4.0RC. When the design doc stabilizes again, we can re-commit its 
state at that time as a pdf replacing the pointer.  This can happen before or 
after the RC IMO.

> Check-in "Enable memstore replication..." design
> ------------------------------------------------
>
>                 Key: HBASE-25284
>                 URL: https://issues.apache.org/jira/browse/HBASE-25284
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Michael Stack
>            Assignee: Michael Stack
>            Priority: Major
>             Fix For: 3.0.0-alpha-1, 2.4.0
>
>
> Add the design doc under dev-support/design-docs



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to