[ 
https://issues.apache.org/jira/browse/HBASE-25457?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang reassigned HBASE-25457:
---------------------------------

    Assignee: Duo Zhang

> Possible race in AsyncConnectionImpl between getChoreService and close
> ----------------------------------------------------------------------
>
>                 Key: HBASE-25457
>                 URL: https://issues.apache.org/jira/browse/HBASE-25457
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>
> On branch HBASE-22120, spotbugs reported a high priority error about this 
> problem, but the problem also exists on master.
> Let's fix it.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to