[ https://issues.apache.org/jira/browse/HBASE-25457?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Duo Zhang reassigned HBASE-25457: --------------------------------- Assignee: Duo Zhang > Possible race in AsyncConnectionImpl between getChoreService and close > ---------------------------------------------------------------------- > > Key: HBASE-25457 > URL: https://issues.apache.org/jira/browse/HBASE-25457 > Project: HBase > Issue Type: Bug > Reporter: Duo Zhang > Assignee: Duo Zhang > Priority: Major > > On branch HBASE-22120, spotbugs reported a high priority error about this > problem, but the problem also exists on master. > Let's fix it. -- This message was sent by Atlassian Jira (v8.3.4#803005)