[
https://issues.apache.org/jira/browse/HBASE-25600?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Peter Somogyi updated HBASE-25600:
----------------------------------
Status: Patch Available (was: Open)
> Increase timeout for HBase-Flaky-Tests on branch-2.2
> ----------------------------------------------------
>
> Key: HBASE-25600
> URL: https://issues.apache.org/jira/browse/HBASE-25600
> Project: HBase
> Issue Type: Task
> Components: test
> Affects Versions: 2.2.7
> Reporter: Peter Somogyi
> Assignee: Peter Somogyi
> Priority: Trivial
> Fix For: 2.2.7
>
>
> The flaky test list got horrible on branch-2.2 and the HBase-Flaky-Tests
> can't finish in the 2 hours timeout so the list keeps increasing.
> Change the timeout on this branch to 4 hours so the job could finish.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)