[ 
https://issues.apache.org/jira/browse/HBASE-28210?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Work on HBASE-28210 started by Duo Zhang.
-----------------------------------------
> Should not add procedure to rollback step when it is suspended
> --------------------------------------------------------------
>
>                 Key: HBASE-28210
>                 URL: https://issues.apache.org/jira/browse/HBASE-28210
>             Project: HBase
>          Issue Type: Bug
>          Components: master, proc-v2
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Critical
>
> Found this when implementing HBASE-28199, as after HBASE-28199 we will 
> suspend procedures a lot, so a missed scenario has been covered and it will 
> fail some UTs with corrupted procedures when loading.
> I think this issue should be fixed separately as it affects all active 
> branches.
> Let me try to implement a UT first.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to