[
https://issues.apache.org/jira/browse/HBASE-28210?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Work on HBASE-28210 started by Duo Zhang.
-----------------------------------------
> Should not add procedure to rollback step when it is suspended
> --------------------------------------------------------------
>
> Key: HBASE-28210
> URL: https://issues.apache.org/jira/browse/HBASE-28210
> Project: HBase
> Issue Type: Bug
> Components: master, proc-v2
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Critical
>
> Found this when implementing HBASE-28199, as after HBASE-28199 we will
> suspend procedures a lot, so a missed scenario has been covered and it will
> fail some UTs with corrupted procedures when loading.
> I think this issue should be fixed separately as it affects all active
> branches.
> Let me try to implement a UT first.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)