[ 
https://issues.apache.org/jira/browse/HBASE-5324?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jimmy Xiang updated HBASE-5324:
-------------------------------

      Description: Hbck fix should show the planned operations/steps at first, 
then start the actual fix after confirmed by the user.  (was: Hbck fix should 
have a dryrun option, or show the planned operations/steps at first, then start 
the actual fix after confirmed by the user.)
    Fix Version/s:     (was: 0.96.0)
          Summary: interactive hbck: fix something after confirmed from user  
(was: Hbck fix dryrun/plan )
    
> interactive hbck: fix something after confirmed from user
> ---------------------------------------------------------
>
>                 Key: HBASE-5324
>                 URL: https://issues.apache.org/jira/browse/HBASE-5324
>             Project: HBase
>          Issue Type: New Feature
>          Components: hbck
>    Affects Versions: 0.94.0
>            Reporter: Jimmy Xiang
>
> Hbck fix should show the planned operations/steps at first, then start the 
> actual fix after confirmed by the user.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to