[
https://issues.apache.org/jira/browse/HBASE-30553?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Work on HBASE-30553 started by Kevin Geiszler.
----------------------------------------------
> Add unit test case for Point-In-Time Restore using a backup set
> ---------------------------------------------------------------
>
> Key: HBASE-30553
> URL: https://issues.apache.org/jira/browse/HBASE-30553
> Project: HBase
> Issue Type: Test
> Components: backup&restore
> Reporter: Kevin Geiszler
> Assignee: Kevin Geiszler
> Priority: Major
> Labels: pull-request-available
>
> The upstream continuous backup & pitr test
> [document|https://docs.google.com/document/d/1yyZg0GIx_d-1_CbiFynYbeGdZd8yut0uWPO_zR8H_KQ/edit?tab=t.0#heading=h.jvt5wxy5la5h]
> mentions a test case for running Point-In-Time Restore using a backup set:
> {quote}*Test 9: Backup Set Restore (-s)*
> *What it does:* Uses backup set name instead of table list.
> *Expected:* All tables in set restored.
> {quote}
> While working on integration tests for Point-In-Time Restore (HBASE-29418), I
> realized it would be better to have this test case in its own unit test
> rather than add it to the integration test. This is because the integration
> test uses {{{}PointInTimeRestoreRequest{}}}, which already assumes the backup
> set has been resolved to a table list. Instead, it would be better to use
> {{{}ToolRunner{}}}.
--
This message was sent by Atlassian Jira
(v10.3.26#10030026)