[ 
https://issues.apache.org/jira/browse/HBASE-6921?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack resolved HBASE-6921.
--------------------------

    Resolution: Fixed

This seems to fix the jdk7 issues.  Resolving.
                
> String and ConcurrentHashMap sizes change on jdk7; makes TestHeapSize fail; 
> second attempt
> ------------------------------------------------------------------------------------------
>
>                 Key: HBASE-6921
>                 URL: https://issues.apache.org/jira/browse/HBASE-6921
>             Project: HBase
>          Issue Type: Bug
>          Components: test
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.96.0
>
>         Attachments: 6921.txt
>
>
> HBASE-6918 added debug.  Jenkins runs jdk7 23.0-b21.  Locally I have 
> 23.6-b03.  It looks like ConcurrentHashMap is a different size in these two 
> jvm's (To be confirmed).

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to