[
https://issues.apache.org/jira/browse/HBASE-7103?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13494589#comment-13494589
]
Hadoop QA commented on HBASE-7103:
----------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12552963/7103-6088-revert.txt
against trunk revision .
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 3 new
or modified tests.
{color:green}+1 hadoop2.0{color}. The patch compiles against the hadoop
2.0 profile.
{color:red}-1 javadoc{color}. The javadoc tool appears to have generated
87 warning messages.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:red}-1 findbugs{color}. The patch appears to introduce 18 new
Findbugs (version 1.3.9) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:red}-1 core tests{color}. The patch failed these unit tests:
org.apache.hadoop.hbase.util.TestMiniClusterLoadEncoded
Test results:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//testReport/
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-hadoop2-compat.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-examples.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-hadoop1-compat.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-common.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-hadoop-compat.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-server.html
Console output:
https://builds.apache.org/job/PreCommit-HBASE-Build/3301//console
This message is automatically generated.
> Need to fail split if SPLIT znode is deleted even before the split is
> completed.
> --------------------------------------------------------------------------------
>
> Key: HBASE-7103
> URL: https://issues.apache.org/jira/browse/HBASE-7103
> Project: HBase
> Issue Type: Bug
> Reporter: ramkrishna.s.vasudevan
> Assignee: ramkrishna.s.vasudevan
> Fix For: 0.94.3, 0.96.0
>
> Attachments: 7103-6088-revert.txt, HBASE-7103_testcase.patch
>
>
> This came up after the following mail in dev list
> 'infinite loop of RS_ZK_REGION_SPLIT on .94.2'.
> The following is the reason for the problem
> The following steps happen
> -> Initially the parent region P1 starts splitting.
> -> The split is going on normally.
> -> Another split starts at the same time for the same region P1. (Not sure
> why this started).
> -> Rollback happens seeing an already existing node.
> -> This node gets deleted in rollback and nodeDeleted Event starts.
> -> In nodeDeleted event the RIT for the region P1 gets deleted.
> -> Because of this there is no region in RIT.
> -> Now the first split gets over. Here the problem is we try to transit the
> node to SPLITTING to SPLIT. But the node even does not exist.
> But we don take any action on this. We think it is successful.
> -> Because of this SplitRegionHandler never gets invoked.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira