[ 
https://issues.apache.org/jira/browse/HBASE-7407?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

nkeywal updated HBASE-7407:
---------------------------

    Status: Open  (was: Patch Available)
    
> TestMasterFailover under tests some cases and over tests some others
> --------------------------------------------------------------------
>
>                 Key: HBASE-7407
>                 URL: https://issues.apache.org/jira/browse/HBASE-7407
>             Project: HBase
>          Issue Type: Bug
>          Components: master, Region Assignment, test
>    Affects Versions: 0.96.0
>            Reporter: nkeywal
>            Assignee: nkeywal
>            Priority: Minor
>         Attachments: 7407.v1.patch, 7407.v2.patch
>
>
> The tests are done with this settings:
>     conf.setInt("hbase.master.assignment.timeoutmonitor.period", 2000);
>     conf.setInt("hbase.master.assignment.timeoutmonitor.timeout", 4000);
> As a results:
> 1) some tests seems to work, but in real life, the recovery would take 5 
> minutes or more, as in production there always higher. So we don't see the 
> real issues.
> 2) The tests include specific cases that should not happen in production. It 
> works because the timeout catches everything, but these scenarios do not need 
> to be optimized, as they cannot happen. 

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to