[
https://issues.apache.org/jira/browse/HBASE-7747?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13587663#comment-13587663
]
Nick Dimiduk commented on HBASE-7747:
-------------------------------------
I could, but what would that maximum number be? Should it be fixed at some
number? Should it sniff the Runtime for heap size? This seems like a pretty
arcane configuration point.
I'd prefer to re-tool other parts of the MR plumbing such that buffering the
puts is unnecessary.
> Import tools should use a combiner to merge Puts
> ------------------------------------------------
>
> Key: HBASE-7747
> URL: https://issues.apache.org/jira/browse/HBASE-7747
> Project: HBase
> Issue Type: Improvement
> Components: mapreduce, Performance
> Reporter: Nick Dimiduk
> Assignee: Nick Dimiduk
> Priority: Minor
> Fix For: 0.95.0
>
> Attachments:
> 0001-HBASE-7747-Import-use-a-Put-combiner-where-possible.patch
>
>
> Multiple Puts to the same row should be combined into a single mutation
> object. This can be done with a Combiner. Import.Importer#writeResult appears
> to do this manually.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira