[ 
https://issues.apache.org/jira/browse/HBASE-8251?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13621713#comment-13621713
 ] 

ramkrishna.s.vasudevan commented on HBASE-8251:
-----------------------------------------------

Nice review Chunhui.  I remember we tried with different JIRAs to tackle this 
problem of ROOT and META going down on master initialization along with SSH.
                
> enable SSH before assign META on Master startup
> -----------------------------------------------
>
>                 Key: HBASE-8251
>                 URL: https://issues.apache.org/jira/browse/HBASE-8251
>             Project: HBase
>          Issue Type: Bug
>          Components: master, Region Assignment
>    Affects Versions: 0.94.6
>            Reporter: Jieshan Bean
>            Assignee: Jieshan Bean
>         Attachments: HBASE-8251-94.patch
>
>
> I think HBASE-5918 could not fix this issue. In HMaster#assignRootAndMeta:
> 1. Assign ROOT.
> 2. Block until ROOT be opened.
> 3. Assign META.
> 4. Block until META be opened.
> SSH is enabled after step 4. So if the RS who host ROOT dies before step 4, 
> master will be blocked.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to