[ 
https://issues.apache.org/jira/browse/HBASE-8581?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-8581:
-------------------------

      Resolution: Fixed
    Hadoop Flags: Reviewed
          Status: Resolved  (was: Patch Available)

Committed to 0.95 and 0.98.
                
> rpc refactor dropped passing the operation timeout through to the rpcclient
> ---------------------------------------------------------------------------
>
>                 Key: HBASE-8581
>                 URL: https://issues.apache.org/jira/browse/HBASE-8581
>             Project: HBase
>          Issue Type: Bug
>            Reporter: stack
>            Assignee: stack
>             Fix For: 0.98.0, 0.95.1
>
>         Attachments: 8581.txt, 8581v3.txt
>
>
> jd was poking and noticed that we were not passing the operation timeout down 
> as rpc timeout as we used to in 0.94.  Let me fix.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to