[
https://issues.apache.org/jira/browse/HIVE-9518?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14385130#comment-14385130
]
Hive QA commented on HIVE-9518:
-------------------------------
{color:red}Overall{color}: -1 at least one tests failed
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12707843/HIVE-9518.8.patch
{color:red}ERROR:{color} -1 due to 3 failed/errored test(s), 8674 tests executed
*Failed tests:*
{noformat}
TestMinimrCliDriver-smb_mapjoin_8.q - did not produce a TEST-*.xml file
TestSparkClient - did not produce a TEST-*.xml file
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_groupby3_map
{noformat}
Test results:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/3189/testReport
Console output:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/3189/console
Test logs:
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-3189/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 3 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12707843 - PreCommit-HIVE-TRUNK-Build
> Implement MONTHS_BETWEEN aligned with Oracle one
> ------------------------------------------------
>
> Key: HIVE-9518
> URL: https://issues.apache.org/jira/browse/HIVE-9518
> Project: Hive
> Issue Type: Improvement
> Components: UDF
> Reporter: Xiaobing Zhou
> Assignee: Alexander Pivovarov
> Attachments: HIVE-9518.1.patch, HIVE-9518.2.patch, HIVE-9518.3.patch,
> HIVE-9518.4.patch, HIVE-9518.5.patch, HIVE-9518.6.patch, HIVE-9518.7.patch,
> HIVE-9518.8.patch
>
>
> This is used to track work to build Oracle like months_between. Here's
> semantics:
> MONTHS_BETWEEN returns number of months between dates date1 and date2. If
> date1 is later than date2, then the result is positive. If date1 is earlier
> than date2, then the result is negative. If date1 and date2 are either the
> same days of the month or both last days of months, then the result is always
> an integer. Otherwise Oracle Database calculates the fractional portion of
> the result based on a 31-day month and considers the difference in time
> components date1 and date2.
> Should accept date, timestamp and string arguments in the format 'yyyy-MM-dd'
> or 'yyyy-MM-dd HH:mm:ss'.
> The result should be rounded to 8 decimal places.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)