[
https://issues.apache.org/jira/browse/HIVE-19498?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16489806#comment-16489806
]
Hive QA commented on HIVE-19498:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12924696/HIVE-19498.04.patch
{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 14401 tests
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[vector_decimal_aggregate]
(batchId=19)
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver[vector_decimal_aggregate]
(batchId=116)
{noformat}
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/11188/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/11188/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-11188/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12924696 - PreCommit-HIVE-Build
> Vectorization: CAST expressions produce wrong results
> -----------------------------------------------------
>
> Key: HIVE-19498
> URL: https://issues.apache.org/jira/browse/HIVE-19498
> Project: Hive
> Issue Type: Bug
> Components: Hive
> Reporter: Matt McCline
> Assignee: Matt McCline
> Priority: Blocker
> Fix For: 3.1.0
>
> Attachments: HIVE-19498.01.patch, HIVE-19498.02.patch,
> HIVE-19498.03.patch, HIVE-19498.04.patch
>
>
> Wrong results for:
> DATE --> BOOLEAN
> DOUBLE --> DECIMAL
> STRING|CHAR|VARCHAR --> DECIMAL
> TIMESTAMP --> LONG
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)