[ 
https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16525869#comment-16525869
 ] 

Hive QA commented on HIVE-19829:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12929332/HIVE-19829.10.patch

{color:green}SUCCESS:{color} +1 due to 4 test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 14612 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/12201/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/12201/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-12201/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12929332 - PreCommit-HIVE-Build

> Incremental replication load should create tasks in execution phase rather 
> than semantic phase
> ----------------------------------------------------------------------------------------------
>
>                 Key: HIVE-19829
>                 URL: https://issues.apache.org/jira/browse/HIVE-19829
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 4.0.0
>
>         Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch, 
> HIVE-19829.03.patch, HIVE-19829.04.patch, HIVE-19829.06.patch, 
> HIVE-19829.07.patch, HIVE-19829.07.patch, HIVE-19829.08-branch-3.patch, 
> HIVE-19829.08.patch, HIVE-19829.09.patch, HIVE-19829.10.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create 
> number of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to