[
https://issues.apache.org/jira/browse/HIVE-17683?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16546665#comment-16546665
]
Hive QA commented on HIVE-17683:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12931907/HIVE-17683.04.patch
{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 14648 tests
executed
*Failed tests:*
{noformat}
TestMiniTezCliDriver - did not produce a TEST-*.xml file (likely timed out)
(batchId=106)
[update_orig_table.q,explainanalyze_3.q,orc_vectorization_ppd.q,vector_non_string_partition.q,multi_count_distinct.q,explainanalyze_1.q,explainuser_3.q,explainanalyze_4.q,hybridgrace_hashjoin_1.q,delete_orig_table.q,hybridgrace_hashjoin_2.q,tez-tag.q,orc_merge12.q,explainanalyze_5.q,vector_join_part_col_char.q]
{noformat}
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/12654/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/12654/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-12654/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12931907 - PreCommit-HIVE-Build
> Annotate Query Plan with locking information
> --------------------------------------------
>
> Key: HIVE-17683
> URL: https://issues.apache.org/jira/browse/HIVE-17683
> Project: Hive
> Issue Type: New Feature
> Components: Transactions
> Reporter: Eugene Koifman
> Assignee: Igor Kryvenko
> Priority: Critical
> Attachments: HIVE-17683.01.patch, HIVE-17683.02.patch,
> HIVE-17683.03.patch, HIVE-17683.04.patch
>
>
> Explore if it's possible to add info about what locks will be asked for to
> the query plan.
> Lock acquisition (for Acid Lock Manager) is done in
> DbTxnManager.acquireLocks() which is called once the query starts running.
> Would need to refactor that.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)