[
https://issues.apache.org/jira/browse/HIVE-20120?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
mahesh kumar behera updated HIVE-20120:
---------------------------------------
Attachment: HIVE-20120.01-branch-3.patch
> Incremental repl load DAG generation is causing OOM error.
> ----------------------------------------------------------
>
> Key: HIVE-20120
> URL: https://issues.apache.org/jira/browse/HIVE-20120
> Project: Hive
> Issue Type: Task
> Components: repl
> Affects Versions: 3.1.0, 4.0.0
> Reporter: mahesh kumar behera
> Assignee: mahesh kumar behera
> Priority: Major
> Labels: pull-request-available
> Fix For: 4.0.0
>
> Attachments: HIVE-20120.01-branch-3.patch, HIVE-20120.01.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create
> number of tasks equal to the configured value.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)