[
https://issues.apache.org/jira/browse/HIVE-20405?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16595859#comment-16595859
]
slim bouguerra commented on HIVE-20405:
---------------------------------------
I can see from the logs that the default batch size for miniDruidTests is 5
(grep for qFileTest.miniDruid.batchSize) at
http://104.198.109.242/logs/PreCommit-HIVE-Build-13517/execution.txt
This leads to running multiple tests setups for Druid tests, that causes issue
if each batch is trying to startup a Druid Cluster. I think a short fix can be
to increase the batch size to something like 50, this will ensure that only one
Druid Cluster is used.
{code}
QFileTestBatch [batchId=192, size=5, driver=TestMiniDruidCliDriver,
queryFilesProperty=qfile,
name=192-TestMiniDruidCliDriver-druidmini_test_ts.q-druidmini_mv.q-druid_timestamptz2.q-and-2-more,
tests=[druidmini_test_ts.q, druidmini_mv.q, druid_timestamptz2.q,
druidmini_extractTime.q, druidmini_floorTime.q], isParallel=true,
moduleName=itests/qtest]
2018-08-29 00:08:31,293 DEBUG [TestExecutor] ExecutionPhase.execute:98 PBatch:
QFileTestBatch [batchId=193, size=5, driver=TestMiniDruidCliDriver,
queryFilesProperty=qfile,
name=193-TestMiniDruidCliDriver-druidmini_dynamic_partition.q-druidmini_expressions.q-druidmini_test_alter.q-and-2-more,
tests=[druidmini_dynamic_partition.q, druidmini_expressions.q,
druidmini_test_alter.q, druidmini_test1.q, druidmini_test_insert.q],
isParallel=true, moduleName=itests/qtest]
2018-08-29 00:08:31,293 DEBUG [TestExecutor] ExecutionPhase.execute:98 PBatch:
QFileTestBatch [batchId=194, size=3, driver=TestMiniDruidCliDriver,
queryFilesProperty=qfile,
name=194-TestMiniDruidCliDriver-druidmini_masking.q-druidmini_joins.q-druid_timestamptz.q,
tests=[druidmini_masking.q, druidmini_joins.q, druid_timestamptz.q],
isParallel=true, moduleName=itests/qtest]
{code}
> Run all druid tests in one batch
> --------------------------------
>
> Key: HIVE-20405
> URL: https://issues.apache.org/jira/browse/HIVE-20405
> Project: Hive
> Issue Type: Test
> Components: Testing Infrastructure
> Reporter: Vineet Garg
> Assignee: Nishant Bangarwa
> Priority: Major
>
> Running druid tests in parallel could cause issues so all of the tests should
> be run in one batch.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)