[
https://issues.apache.org/jira/browse/HIVE-20542?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16657642#comment-16657642
]
Hive QA commented on HIVE-20542:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12944753/HIVE-20542.03
{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 15106 tests
executed
*Failed tests:*
{noformat}
TestMiniDruidCliDriver - did not produce a TEST-*.xml file (likely timed out)
(batchId=195)
[druidmini_dynamic_partition.q,druidmini_test_ts.q,druidmini_expressions.q,druidmini_test_alter.q,druidmini_test_insert.q]
{noformat}
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/14579/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/14579/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-14579/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12944753 - PreCommit-HIVE-Build
> Incremental REPL DUMP progress information log message is incorrect.
> --------------------------------------------------------------------
>
> Key: HIVE-20542
> URL: https://issues.apache.org/jira/browse/HIVE-20542
> Project: Hive
> Issue Type: Bug
> Components: repl
> Affects Versions: 4.0.0, 3.2.0
> Reporter: Sankar Hariappan
> Assignee: Ashutosh Bapat
> Priority: Minor
> Labels: DR, Replication, pull-request-available
> Attachments: HIVE-20542.01.patch, HIVE-20542.02, HIVE-20542.03
>
>
> Incremental REPL DUMP have the progress information logged as
> "eventsDumpProgress":"49/0".
> It should actually log the estimated number of events are denominator but it
> is coming as 0 always.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)