[
https://issues.apache.org/jira/browse/HIVE-21217?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16766518#comment-16766518
]
Hive QA commented on HIVE-21217:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12958422/HIVE-21217.0.patch
{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.
{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 15796 tests
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[windowing_range_multiorder]
(batchId=7)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[vector_windowing_range_multiorder]
(batchId=163)
{noformat}
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/16039/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/16039/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-16039/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12958422 - PreCommit-HIVE-Build
> Optimize range calculation for PTF
> ----------------------------------
>
> Key: HIVE-21217
> URL: https://issues.apache.org/jira/browse/HIVE-21217
> Project: Hive
> Issue Type: Improvement
> Reporter: Adam Szita
> Assignee: Adam Szita
> Priority: Major
> Attachments: HIVE-21217.0.patch
>
>
> During window function execution Hive has to iterate on neighbouring rows of
> the current row to find the beginning and end of the proper range (on which
> the aggregation will be executed).
> When we're using range based windows and have many rows with a certain key
> value this can take a lot of time. (e.g. partition size of 80M, in which we
> have 2 ranges of 40M rows according to the orderby column: within these 40M
> rowsets we're doing 40M x 40M/2 steps.. which is of n^2 time complexity)
> I propose to introduce a cache that keeps track of already calculated range
> ends so it can be reused in future scans.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)