[
https://issues.apache.org/jira/browse/HIVE-21988?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16884251#comment-16884251
]
Hive QA commented on HIVE-21988:
--------------------------------
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12974523/HIVE-21988.patch
{color:red}ERROR:{color} -1 due to build exiting with an error
Test results:
https://builds.apache.org/job/PreCommit-HIVE-Build/18008/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18008/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18008/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Tests exited with: Exception: Patch URL
https://issues.apache.org/jira/secure/attachment/12974523/HIVE-21988.patch was
found in seen patch url's cache and a test was probably run already on it.
Aborting...
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12974523 - PreCommit-HIVE-Build
> Do not consider nodes with 0 capacity when calculating host affinity
> --------------------------------------------------------------------
>
> Key: HIVE-21988
> URL: https://issues.apache.org/jira/browse/HIVE-21988
> Project: Hive
> Issue Type: Sub-task
> Components: llap
> Reporter: Peter Vary
> Assignee: Peter Vary
> Priority: Major
> Labels: pull-request-available
> Attachments: HIVE-21988.patch
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> When a node is blacklisted (capacity set to 0) then we should not assign any
> more tasks to it
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)