[ 
https://issues.apache.org/jira/browse/HIVE-22241?focusedWorklogId=318431&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-318431
 ]

ASF GitHub Bot logged work on HIVE-22241:
-----------------------------------------

                Author: ASF GitHub Bot
            Created on: 25/Sep/19 16:15
            Start Date: 25/Sep/19 16:15
    Worklog Time Spent: 10m 
      Work Description: jcamachor commented on pull request #789: HIVE-22241
URL: https://github.com/apache/hive/pull/789
 
 
   
 
----------------------------------------------------------------
This is an automated message from the Apache Git Service.
To respond to the message, please log on to GitHub and use the
URL above to go to the specific comment.
 
For queries about this service, please contact Infrastructure at:
[email protected]


Issue Time Tracking
-------------------

            Worklog Id:     (was: 318431)
    Remaining Estimate: 0h
            Time Spent: 10m

> Implement UDF to convert a date/timestamp from Gregorian-Julian hybrid 
> calendar to proleptic Gregorian calendar
> ---------------------------------------------------------------------------------------------------------------
>
>                 Key: HIVE-22241
>                 URL: https://issues.apache.org/jira/browse/HIVE-22241
>             Project: Hive
>          Issue Type: Improvement
>          Components: UDF
>            Reporter: Jesus Camacho Rodriguez
>            Assignee: Jesus Camacho Rodriguez
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-22241.01.patch, HIVE-22241.patch
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> UDF that converts a date/timestamp from *Gregorian-Julian hybrid* calendar, 
> i.e., calendar that supports both the Julian and Gregorian calendar systems 
> with the support of a single discontinuity, which corresponds by default to 
> the Gregorian date when the Gregorian calendar was instituted, to *proleptic 
> Gregorian calendar* (ISO 8601 standard), which is produced by extending the 
> Gregorian calendar backward to dates preceding its official introduction in 
> 1582.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to